Friends, Neighbors,
I am pleased to let you know that the following candidates in the Mayor's race have confirmed their attendance at our spring meeting to be held tonight at Covenant Congregational Church, 455 Arborway, at 6:30pm.
Felix Arroyo
John Barros
Charles Clemons
John Connolly
Rob Consalvo
John Laing
Charlotte Golar Richie
Marty Walsh
Bill Walzcak had a previously scheduled event and is unable to attend. The other candidates have not yet given final replies. I will update this today if/when they do.
See you tonight, ... bring your friends!
Monday, May 6, 2013
Sunday, May 5, 2013
What do you want to hear from the Mayoral candidates?
Post your questions in "comments" below -- we'll ask even if you can't attend tomorrow's forum.
Saturday, May 4, 2013
Join the Candidates for Mayor on Monday evening at the WRCNA Spring meeting!
The West Roxbury Courthouse Neighborhood Association is pleased to invite you to attend our conversation with candidates at 6:30 p.m. on Monday, May 6th.
Each candidate in attendance will offer a brief introduction and statement about why they are running, and then there will be time for questions/answers and discussion with the community members in attendance.
All community members are invited to join us. There is no charge.
The meeting will be held at the Covenant Congregational Church, 455 Arborway, JP. All Mayoral candidates have been invited, three have confirmed and others are working on their schedules. An updated list of who is attending will be posted here on Monday.
Hope to see you!
Wednesday, November 21, 2012
Holiday Junk Mail
Thanks for checking in! Now that you're here, click on the Catalog Choice button to remove yourself from the zillions of mailing lists sending you junk mail this season!
Happy Holidays!
Tuesday, November 13, 2012
Bruce Wallin, WRCNA Founder
I haven't done a very good job of keeping this blog up - as I am nearly a year late in announcing Bruce's death. We still miss him, though, so it isn't too late to link his short obituary from our local paper and the longer one from Northeastern.
My apologies for the late posting.
http://jamaicaplaingazette.com/2012/01/06/wrcna-head-dies/
http://www.northeastern.edu/news/2012/01/wallin/
Saturday, December 10, 2011
Casey Overpass Repair Schedule and Detour Plans
Hi All:
As I am sure you know, the roadway deck of the Casey Overpass (Route 203) in Boston is in rough shape. We have received many complaints about the potholes and bumpy driving surface over the last several months including 3 in the last 48 hours.
In September D6 maintenance reviewed the issue and began working on a repair plan
In October D6 paving contract for District wide maintenance approved
In Late November bridge engineers approved the re-surfacing plan
Last 2 weeks plan was finalized
Week of 12/12 - patching and resurfacing to commence
The Resurfacing will require MassDOT to close the overpass in both directions for three nights next week.
During this time period, we will be doing a lot of work, much of which will be very noisy. This work is required to prep the roadway for paving which we will do next week as well.
Below is the work plan with hours of operation and the work that will be required for each night. All work is weather dependent.
The detour plan for when the overpass is closed is attached. We will post police details at the closure locations and at also at these two critical intersections, as well as several others highlighted to us by Boston Police :
Washington/South @ New Washington Street
Hyde Park/Washington @ New Washington Street
WORK PLAN
Wednesday Night, Dec 14 and Thursday Night, Dec 15
9 PM – 5 AM
9 PM Close Casey Overpass (both directions) with in-house Bridge Crew working WB and SPS Contractor working EB. Sawcut cutting Jack Hammer noise overnight Open Casey Overpass by 5 AM each morning (NOTE: applying asphalt so hot box or truck for each crew/direction will be needed) If an additional night is needed it will be with our In-House Crew with work possibly Friday night into Saturday.
Sunday Night, Dec 18
9 PM – 5 AM
Close WB at 9 PM for Paving Operations (Less Noise)—at around Midnight we will implement an EB Closure and begin paving while rolling of asphalt continues on WB. WB Should open by 2 AM…EB will be open by 5 AM.
Early Thursday Morning, Dec 22 (fall back date early 12:01AM Early Friday Morning, Dec 23)
12:01AM - till dry
Temp Closure (say 1 Hour—pending dry time) of EB and WB for Pavement Marking application.
As I am sure you know, the roadway deck of the Casey Overpass (Route 203) in Boston is in rough shape. We have received many complaints about the potholes and bumpy driving surface over the last several months including 3 in the last 48 hours.
In September D6 maintenance reviewed the issue and began working on a repair plan
In October D6 paving contract for District wide maintenance approved
In Late November bridge engineers approved the re-surfacing plan
Last 2 weeks plan was finalized
Week of 12/12 - patching and resurfacing to commence
The Resurfacing will require MassDOT to close the overpass in both directions for three nights next week.
During this time period, we will be doing a lot of work, much of which will be very noisy. This work is required to prep the roadway for paving which we will do next week as well.
Below is the work plan with hours of operation and the work that will be required for each night. All work is weather dependent.
The detour plan for when the overpass is closed is attached. We will post police details at the closure locations and at also at these two critical intersections, as well as several others highlighted to us by Boston Police :
Washington/South @ New Washington Street
Hyde Park/Washington @ New Washington Street
WORK PLAN
Wednesday Night, Dec 14 and Thursday Night, Dec 15
9 PM – 5 AM
9 PM Close Casey Overpass (both directions) with in-house Bridge Crew working WB and SPS Contractor working EB. Sawcut cutting Jack Hammer noise overnight Open Casey Overpass by 5 AM each morning (NOTE: applying asphalt so hot box or truck for each crew/direction will be needed) If an additional night is needed it will be with our In-House Crew with work possibly Friday night into Saturday.
Sunday Night, Dec 18
9 PM – 5 AM
Close WB at 9 PM for Paving Operations (Less Noise)—at around Midnight we will implement an EB Closure and begin paving while rolling of asphalt continues on WB. WB Should open by 2 AM…EB will be open by 5 AM.
Early Thursday Morning, Dec 22 (fall back date early 12:01AM Early Friday Morning, Dec 23)
12:01AM - till dry
Temp Closure (say 1 Hour—pending dry time) of EB and WB for Pavement Marking application.